Publication

Consultation Response: Identification of system needs for the TEN-E priority electricity and offshore grid corridors

Overall, criteria appear suitable to identify the needs for infrastructure for the development of interconnectors to strengthen the European electricity grid. However, Bellona considers it crucial to not consider hydrogen-based solutions as an alternative for the development of the electricity grid.

Through the funds allocated within the Connecting Europe Facility, the EU has the opportunity to strategically and financially support the development of cross-border energy infrastructure between EU countries. In order to ensure public money is allocated to projects that maximize benefits for market integration, security of supply and sustainability, the Commission is tasked to develop guidelines and indicators to assess them.  

Before concrete Projects of Common Interest (PCI) and Projects of Mutual Interest (PMI) for electricity and offshore grid corridors, as well as for hydrogen infrastructure can be selected for funding within the Trans-European Networks for Energy (TEN-E) framework, the Members of the regional stakeholders working groups were asked for feedback on the selection criteria. Bellona welcomes this opportunity and provided recommendations both on the “Identification of system needs for the TEN-E priority electricity and offshore grid corridors” and the “Identification of Hydrogen infrastructure needs for the TEN-E priority corridors“. 

Overall, the proposed criteria appear to be suitable for identifying the cross-border infrastructure needs of interconnectors to strengthen the European electricity grid and those of a currently nascent hydrogen economy. Nevertheless, Bellona considers it crucial not to treat hydrogen-based solutions as an alternative to the expansion of the electricity grid. Subjecting a needs assessment for hydrogen infrastructure to realistic models that assume maximum energy efficiency through direct electrification while simultaneously identifying the corresponding expansion needs for the electricity grid is a critical balancing act.   

Most importantly, Bellona urges for the inclusion of sustainability criteria that are based on rigorous climate and environmental standards in both project assessment methodologies. Thorough consideration of potential environmental impacts is essential to ensure that the deployment of electricity grid and hydrogen infrastructure does in fact achieve the highest emission reductions possible without delaying climate action and hampering nature conservation.  

Download our consultation response here:

Identification of system needs for the TEN-E priority electricity and offshore grid corridors