Joint letter – ICC reform and expansion risks diverting ETS Revenues from real climate action
In light of the European Commission’s ongoing considerations to amend the ETS State Aid Guidelines, revising the rules for Indirec...
News
Publish date: March 30, 2006
News
The work now takes place near the settlement of Indiga in the Nenets Autonomous region, where a new oil terminal and port should be constructed, BarentsObserver reported. The future pipeline will be 467 km long and stretch from the Timano-Pechora province, where 30 million tons of oil to be extracted annually. The capacity of the future pipeline is expected to be 12 million tons per year. The approximate cost of the project is 2,187 billion USD.
In light of the European Commission’s ongoing considerations to amend the ETS State Aid Guidelines, revising the rules for Indirec...
The risks of a methodology that disregards its policy signals and fails to reward investments into clean technologies are too large to ignore. The EU cannot tell the market that continuing fossil-based steel will be rewarded.
A framework still in the making As a member of the European Commission’s Nature Credits Expert Group, Bellona joined the second meeting...
On 19 March, Bellona Europa, Oslo’s Climate Agency, Hafslund Rådgivning, and SINTEF hosted the concluding conference of the Powering-Up a REnew...
On March 10th 2026, the Commission presented the Clean Energy Investment Strategy, as part of an Energy package to boost investment in homegrown cle...
Get our latest news